Access to the rear of the property was only available through the existing house. Small hand carried Grundomat piling equipment was brought through the property into the rear garden allowing the foundations and extension to be constructed.
Access to the rear of the property was only available through the existing house. Small hand carried Grundomat piling equipment was brought through the property into the rear garden allowing the foundations and extension to be constructed.
Bottom driven mini piles were installed through pre augered holes to ensure a sufficient depth of pile was achieved on site through potentially obstructed ground.
The Fairy Tale Brook was redeveloped with new models. The models needed piled foundations to support them and due to the very restricted access to the areas our 150mm diameter bottom driven steel cased mini piles where installed using a Grundomat piling hammer.
New piled foundations were required to support a new domestic dwelling for a private client who was undertaking a self-build property.
‘A big thank you for a job well done. Thank the lads for piling, meshing up and concreting, being efficient and very tidy.’
‘Thanks very much for a job well done. The lads are excellent and thorough. Paul and Mark must be one of your best assets – look after them! I can’t thank you enough. All the best to you Nick, you have been a rock. Thanks for your time and energy.’