Access to the rear of the property was only available through the existing house. Small hand carried Grundomat piling equipment was brought through the property into the rear garden allowing the foundations and extension to be constructed.
Access to the rear of the property was only available through the existing house. Small hand carried Grundomat piling equipment was brought through the property into the rear garden allowing the foundations and extension to be constructed.
A new school building was constructed alongside the existing school. Due to poor ground conditions traditional strip foundations would have been uneconomical and therefore bottom driven piles were installed with reinforced concrete ground beams to support the new construction.