144 No 220mm diameter bottom driven steel cased mini piles were installed to depths in the region of 10Lm though pre-excavated holes through an existing factory yard to support pilecaps on top of which a steel portal frame extension to the factory will be constructed. Three rigs were used to ensure the works were completed within three weeks.